Powering people
at work and play

Connect

Welcome to one of New Zealand’s fastest growing areas. When you connect to the Counties Power network you connect to a power network that is 100% locally owned and operated. Just choose the option that best describes what you are doing.  Most sub-divisions in urban areas have a single phase power supply.  Be sure to ask your electrician if this is enough to meet your needs before you apply for power.  Sub-divisions in rural areas are required to have either two or three phase supply. 

New Build in active new sub-divisions

STEPS

  1. Apply for a new network connection point.
  2. Sign up with an energy retailer.
  3. Run a service line to your buildings.
  4. Have your building wired.
  5. Pass your electrical inspection.

TIPS

  • See our tips for all new builds and renovations.

Start Now!

Apply for a new network connection point here >

 

 

Moving into an existing home, farm or business

Moving into an existing home, farm or business

New Build - other parts of the Counties area

New Build - other parts of the Counties area

Renovations with no new major electrical appliances

Renovations with no new major electrical appliances

Renovations with new major electrical appliances

Renovations with new major electrical appliances

Distributed Generation

Solar, wind or other generation that feeds
power back into the grid.

Distributed Generation

Solar, wind or other generation that feeds
power back into the grid.

Latest Updates