Welcome to one of New Zealand’s fastest growing areas. When you connect to the Counties Power network you connect to power network that is 100% consumer owned and locally operated.   If you are in a rural area be sure to plan for a 2 or 3 phase power supply, as you'll need this to ensure power quality.  If you are building in an urban area you usually have the option of 1, 2 or 3 phase supply.  Check with your electrician to find out which is right for you.

New Build – other parts of the Counties area

Steps

  1. Ask for a new network connection point quote
  2. Pay your capital contribution (if required)
  3. Run a service line from the network to your buildings (if required)
  4. Have your building wired by an electrician
  5. Sign up with an energy retailer
  6. Connect your private service line to the network
  7. Pass your electrical inspection.

Tips

  • See our tips for all new builds and renovations.

Start Now!

Request a new network connection point quote here >

 

 

Moving into an existing home, farm or business

Moving into an existing home, farm or business

New Build in active new sub-divisions

Anselmi Ridge, Pokeno Village Estate and more...

New Build in active new sub-divisions

Anselmi Ridge, Pokeno Village Estate and more...

Renovations with no new major electrical appliances

Renovations with no new major electrical appliances

Renovations with new major electrical appliances

Renovations with new major electrical appliances

Distributed Generation

Solar, wind or other generation that feeds
power back into the grid.

Distributed Generation

Solar, wind or other generation that feeds
power back into the grid.

Latest Updates