Decommissioning an ICP

IF YOU HAVE A CURRENT CONNECTION ON THE COUNTIES POWER NETWORK THAT YOU ARE SEEKING TO PERMANENTLY DECOMMISSION Please complete THE form BELOW

Decommissioning an ICP means that the unique identifier for the connection on the Counties Power network will be expired.  If you want to make a connection in the future, you will need to request a new connection.  More details about a new connection can be found here.

Are you a machine? If not please enter nothing in here:

Site details

The ICP number can be found on your monthly power bill. 

Your meter number can be found on the meter installed at the premise within your meter board. 

 

ICP or Meter number*

           

Attach a photo of your meter if available .

   

Site address*
Suburb*

Requester Details

Name of the person completing this form*
Company name
Contact phone
Email*
What relationship do you have with this supply?*

LEGAL OWNER

Legal name(s) of property owner(s)*
Owner contact phone*
Owner email*
Owner postal address*

Reason for decommissioning ICP

Reason selection*

Physical connection details

Please select the type of connection which currently supplies the property to be decommissioned. 

Service line connection (this is from the roadside to the property supplied)*
Network connection point*
Is there a power account set up with an energy retailer?*
Is the property currently tenanted?*

Date for decommission 

If you have a date that you would like the decommision completed by, please enter below.   Please allow at least 10 days for the physical decommision of an ICP.  

Required by date

Declaration 

I/We accept that the following terms apply for the decommissioning of an Installation Connection Point (ICP) on the Counties Power network. 

1. A copy of this application will be provided to the energy retailer for this supply. 

2. Decommisioning of this ICP will not occur if the site is tenanted or occupied.

3. Counties Power will remove any installed meters and cut the supply away at the network supply point only.

4. Any poles, cables or other fittings on private land will not be removed by Counties Power and will remain owned by and the responsibility of the land owner. 

5. As the legal owner of the property or as an authorised agent for the owner I hereby apply for the decommissioning of the Installation Connection Point (ICP) on the Counties Power electricity network.

I/We accept the terms of decommission above*
Owner name or authorised agent*